Through the associated SERI LAMBRO Ltd., EQUANIMA is building a new hydroelectric green plant in the city of Milan, which will use the waters of the Lambro river to produce 100% renewable energy. The electric production will allow to satisfy the domestic energy need of more than 1.000 people, avoiding the emission of 250 tons of CO2 2 per year, reducing the dependence on fossil sources. Furthermore, historical hydraulic works will be renewed, riverbanks will be upgraded, a fish fauna ladder will be built and there will be planted the double of trees removed for the realization of the plant.